Author |
Message |
cheapbag214s
Joined: 27 Jun 2013
Posts: 20008
Read: 0 topics
Warns: 0/10 Location: England
|
|
in every clime and place |
|
CH-53Ks ordered for testing
PATUXENT RIVER, Md., June 4 () -- Four production-representative CH-53 Super Stallion heavy-lift helicopters are being built by Sikorsky Aircraft for U.S. Marine Corps operational testing.The "System Demonstration Test Articles" were ordered by the Naval Air Systems Command through a $435 million cost-plus-incentive contract."The SDTA contract represents an exciting and significant milestone in our program,[url=http://www.lorcal.com/Louboutin-Men-Classic-Sneakers-12/]Louboutin Men Classic Sneakers[/url]," said Col. Robert Pridgen,[url=http://www.lorcal.com/Christian-Louboutin-Pigalle-15/]Christian Louboutin Men[/url], the Heavy Lift Helicopters program manager for NAVAIR."We are well on our way to making the CH-53K a reality for our Marines and our naval fleet. "The capability this aircraft brings, in every clime and place, is critical to sustaining the future missions of the Marine Air/Ground Task Force."The CH-53K being developed features three engines, new composite rotor blades and a cabin that is wider than other CH-53 variants. It has a cruise speed of 196 mph,[url=http://www.lorcal.com/Christian-Louboutin-Peep-Toe-Pumps-3/]Christian Louboutin Men[/url], a range of 454 nautical miles and a service ceiling of more than 14,[url=http://www.lorcal.com/Louboutin-Men-Loafers-13/]Christian Louboutin Sale[/url],000 feet."The four SDTA aircraft are based on the configuration of the fourth and final flight test aircraft currently being assembled on the prototype production line,[url=http://www.lorcal.com/Christian-Louboutin-Peep-Toe-Pumps-3/]Christian Louboutin Peep Toe Pumps[/url]," said Dr. Michael Torok, Sikorsky's CH-53K Program vice president. "We truly appreciate the high level of confidence the Navy and Marine Corps have shown to the CH-53K team as we move forward with this important next phase of the program." Sikorsky said the four helicopters were added as an additional contract line item under an existing $3.5 billion System Development and Demonstration contract awarded in 2006.Sikorsky will deliver the first SDTA aircraft in 39 months. The fourth will be delivered in early 2017.
The post has been approved 0 times
|
|
Sat 17:35, 07 Dec 2013 |
|
|
|
|
|
|
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum
|
|
|